VANCOUVER GEOTECHNICAL DRILLING PROJECTS

HIGHLAND VALLEY COPPER – 2013

  • Holes to 340 ft.
  • CPT, SCPT, Nilcon & Standard vanes, Shelbys
  • Multiple Vibe Wire Piezometers installs per hole.

EVERGREEN LINE – 2012 TO PRESENT

  • Holes to 175 ft.
  • SPT’s, Shelbys, Vanes, DCPT
  • Vibe Wire & Casagrande Piezometers to 160 ft., 2” Seismic PVC, Pressuremeter testing
  • HQ coring of Confined Concrete Columns.
  • Decommission of wells and test holes.

KITIMAT – RIO TINTO – SHELL – 2012 TO PRESENT

  • Holes to 175 ft.
  • SPT’s, Shelbys, Vanes, HQ-3 Coring, Casagrande Piezometers

NEPTUNE TERMINAL – 2012

  • Vibe Wire Piezometers, 2” Seismic PVC

TUMBLER RIDGE – MURRAY RIVER COAL 2012

  • HQ-3 Coring, Casagrande Piezometers to 140 ft.

JOHNSTON ST. BRIDGE CROSSING – BARGE DRILLING – 2011

  • HQ-3 Coring, SPT’s, Vanes, Shelbys

SOUTH FRASER PERIMETER ROAD – 2010 TO PRESENT

  • Casagrande & Push in Piezometers, Inclinometers, CPT & DCPT
  • SPT’s, Shelbys, and Vanes

KAMLOOPS WASTE TREATMENT PLANT – 2010

  • Holes to 280 ft.
  • SPT’s Shelbys, Vanes
  • Multiple Vibe Wire Piezometer installs per hole to 280 ft

COLUMBIA RIVER CROSSING AT DONALD – 2009 TO 2010

  • Holes to 335 ft.
  • SPT, Shelbys at 200 ft. +, Vanes, HQ-3 & BQ Coring

FOUNTAIN SLIDE – 2009 & 2010

  • HQ-3 Coring to 230 ft.
  • Inclinometers,Vibe Wire Piezometers, Casagrande, and Pneumatic Piezometers

PORT MANN – HIGHWAY 1 PROJECT – 2008 TO 2013

  • Casagrande & Push in Piezometers, Inclinometers, CPT & DCPT
  • SPT’s, Shelbys, and Vanes

SEA TO SKY HIGHWAY – 2004 TO 2008

  • HQ-NQ-BQ Triple Tube Coring
  • Angle drilling
  • Helicopter work
  • Inclinometer, Pneumatic & Casagrande Piezometer installs

KICKING HORSE CANYON PROJECT – 2004 TO 2008

  • NQ-3 Coring to 900 ft.
  • Casagrande Piezometers to 400 ft.
  • Helicopter work

BLACK WALL BLUFFS – GOLDEN

KICKING HORSE CANYON PROJECT

HWY 3A – YELLOW LAKE