HIGHLAND VALLEY COPPER – 2013
- Holes to 340 ft.
- CPT, SCPT, Nilcon & Standard vanes, Shelbys
- Multiple Vibe Wire Piezometers installs per hole.
EVERGREEN LINE – 2012 TO PRESENT
- Holes to 175 ft.
- SPT’s, Shelbys, Vanes, DCPT
- Vibe Wire & Casagrande Piezometers to 160 ft., 2” Seismic PVC, Pressuremeter testing
- HQ coring of Confined Concrete Columns.
- Decommission of wells and test holes.
KITIMAT – RIO TINTO – SHELL – 2012 TO PRESENT
- Holes to 175 ft.
- SPT’s, Shelbys, Vanes, HQ-3 Coring, Casagrande Piezometers
NEPTUNE TERMINAL – 2012
- Vibe Wire Piezometers, 2” Seismic PVC
TUMBLER RIDGE – MURRAY RIVER COAL 2012
- HQ-3 Coring, Casagrande Piezometers to 140 ft.
JOHNSTON ST. BRIDGE CROSSING – BARGE DRILLING – 2011
- HQ-3 Coring, SPT’s, Vanes, Shelbys
SOUTH FRASER PERIMETER ROAD – 2010 TO PRESENT
- Casagrande & Push in Piezometers, Inclinometers, CPT & DCPT
- SPT’s, Shelbys, and Vanes
KAMLOOPS WASTE TREATMENT PLANT – 2010
- Holes to 280 ft.
- SPT’s Shelbys, Vanes
- Multiple Vibe Wire Piezometer installs per hole to 280 ft
COLUMBIA RIVER CROSSING AT DONALD – 2009 TO 2010
- Holes to 335 ft.
- SPT, Shelbys at 200 ft. +, Vanes, HQ-3 & BQ Coring
FOUNTAIN SLIDE – 2009 & 2010
- HQ-3 Coring to 230 ft.
- Inclinometers,Vibe Wire Piezometers, Casagrande, and Pneumatic Piezometers
PORT MANN – HIGHWAY 1 PROJECT – 2008 TO 2013
- Casagrande & Push in Piezometers, Inclinometers, CPT & DCPT
- SPT’s, Shelbys, and Vanes
SEA TO SKY HIGHWAY – 2004 TO 2008
- HQ-NQ-BQ Triple Tube Coring
- Angle drilling
- Helicopter work
- Inclinometer, Pneumatic & Casagrande Piezometer installs
KICKING HORSE CANYON PROJECT – 2004 TO 2008
- NQ-3 Coring to 900 ft.
- Casagrande Piezometers to 400 ft.
- Helicopter work

BLACK WALL BLUFFS – GOLDEN